检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中南大学资源与安全工程学院,湖南长沙410083
出 处:《岩石力学与工程学报》2013年第8期1685-1691,共7页Chinese Journal of Rock Mechanics and Engineering
基 金:国家自然科学基金资助项目(51274249;51274251)
摘 要:预应力锚索是各类永久性岩质边坡最有效的加固手段之一,但其预应力损失使锚索锚固效果难以保证。以一高速公路软岩边坡支护工程为依托,通过现场实测分析,得到锚索预应力的定量损失规律:锚索预应力损失分为瞬时损失和时程损失。前者可达到初始张拉荷载的8%左右;后者又可分为短期和长期损失,其中长期损失的损失量可达到锚索初始张拉荷载的15%左右,该过程约需50 d以上时间完成。分析所得结果为预应力锚索定量补偿张拉和超张拉提供了理论依据,可为同类软岩边坡支护工程提供有益参考。Prestressed anchor-cable is one of the most effective means of permanent rock slope reinforcement: but it's difficult to guarantee the anchoring effect due to the loss of prestress. This paper is based on some highway soft rock slope support engineering, by field measurement analysis, obtained the quantitative prestress loss law. Prestress loss can be divided into instantaneous loss and time loss. The former, caused by strand retraction, can reach about 8% of the initial tensile load. The latter can be divided into short-term and long-term losses, and can reach about 15% of the initial tensile load. The results not only provides theoretical basis for the prestressed anchor rope tensioning and quantitative compensation tensioning, but also provide useful reference for similar soft rock slope support project.
关 键 词:边坡工程 软岩边坡 支护 预应力锚索 预应力损失 定量规律
分 类 号:P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

