长沙综合枢纽施工导流方案优化  被引量:13

Optimum studies on diversion schemes for the construction of Changsha hydroproject

在线阅读下载全文

作  者:刘晓平[1] 田辉[1] 蒋明峰[1] 任启明[1] 扈世龙[1] 赵江[1] 

机构地区:[1]长沙理工大学水利工程学院,湖南长沙410076

出  处:《水利水运工程学报》2013年第4期91-94,共4页Hydro-Science and Engineering

摘  要:针对长沙综合枢纽工程各期围堰情况下束窄河道的行洪能力,对分段围堰法和淹没基坑法相结合的施工导流方式进行优化.采用1∶100的正态水工模型进行流场分析试验,合理分配原设计方案的二、三期施工导流溢流宽度,同时优化纵向围堰平面布置以减小回流区域.对泄流能力和水力特性观测结果进行分析后得出,优化方案能有效调顺束窄河道的水流方向,明显减小回流区域,增加束窄河道的有效溢流宽度;二、三期围堰水位壅高值分别降至0.28和0.43 m,泄洪能力有了较大提高.优化后的施工导流方案已经在长沙综合枢纽施工导流实践中取得了理想的行洪效果,可供同类工程参考.When a hydroproject is being buih at the downstream reach of a city, flood control becomes a very important task. Especially during the construction diversion, the width of overflow is reduced, which leads to water rising at the upstream. If the water rising is too high, the wealth and the life by the riverside can be seriously threatened. So this article aims at the study of the construction diversion schemes for the Changsha hydroproject by using 1 ." 100 physical model test method. Based on the observed results of discharge capacity and waterpower characteristics, proposals on diversion's spillway width and the plane arrangement types of the longitudinal cofferdam are optimized so as to effectively regulate the flow in the narrowed river. Thus the effective width of the overflow is increased, and the water rising and the upstream flooded area are reduced. The optimized construction diversion scheme has a marked flood discharge effect during Changsha hydroproject construction diversion, which can be for similar hydroprojects reference in future.

关 键 词:施工导流 方案优化 物理模型 长沙综合枢纽 

分 类 号:TV131.61[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象