作 者:汪旭[1] 张建民[1] 何小泷[1] 石旭芳[1] 余飞[1,2]
机构地区:[1]四川大学水力学与山区河流开发保护国家重点实验室,成都610065 [2]青海省水利水电勘测设计研究院,西宁810000
出 处:《长江科学院院报》2013年第9期43-46,52,共5页Journal of Changjiang River Scientific Research Institute
摘 要:针对某水电站工程明渠截流面临大水深、高流速、高落差、高单宽功率及合格截流材料难觅等带来的截流技术难题,通过水工模型试验,对不同戗堤和龙口形式进行了对比试验与结果分析,并提出了较为合理的戗堤轴线位置。研究表明:推荐方案充分利用了明渠导墙的导水作用,使水流在导墙的作用下形成"S"形流动,增加了水流流程,减小了龙口处的水力坡降;此外,流程形势由直到弯,水流紊动增强,流动阻力增加,动能耗散增加,从而改善了龙口处水流流态,降低了截流水力学指标和难度。研究成果为该工程的截流施工提供了数据支撑,可供类似工程设计参考。Physical model tests were conducted to solve the technical problems of an open channel closure for a hy- dropower project with large water depth, high water velocity, high drop, high unit-wide power and qualified closure materials which are difficult to be obtained. Tests with different dikes and closure gaps were carried out and a prop- er location of dike axis was determined. Results show that the recommended closure layout increases the flow path, reduces the hydraulic gradient at the closure gap, and results in S-shaped flow pattern. Moreover, the S-shaped closure layout bends the flow path, and enhances the flow turbulence, increases flow resistance and kinetic energy dissipation, thereby improving the flow pattern at the closure gap and reducing the hydraulic difficulty. This re- search provides useful data for the closure construction and can be a reference for similar projects.
分 类 号:TV551.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.225.105