作 者:施发伍[1,2] 王贻明[1] 刘晓辉[1] 张晋军[1,2] 胡文达[1,2]
机构地区:[1]北京科技大学土木与环境工程学院,北京100083 [2]中色非洲矿业有限公司
出 处:《铜业工程》2013年第4期40-42,73,共4页Copper Engineering
基 金:国家"十二五"科技支撑计划项目(2012BAB08B02)
摘 要:谦比希铜矿深部上向分层水平充填采场顶板暴露面积较大,且上盘围岩节理裂隙发育,导致顶板垮冒严重,贫化问题突出。据此提出了采场顶板长锚索预锚固控顶技术,阐述了其支护机理、支护参数及施工工艺。实际应用表明:采用长锚索预锚固控顶、配合锚杆(钢带)联合支护,能够有效控制采场顶板冒落,为类似矿山提供了借鉴意义。The room and pillar upward horizontal sublevel filling method is adopted in the deep ore body of Chambishi Copper Mine, the large exposed area of mine roof and developing joints of surrounding rock in the hanging wall led to serious roof collapse and ore dilution. Thus, the prestress anchorage technology with long anchor cable was put forward to control the stability of roof. The sup- port mechanism, parameter, and construetion process was introduced. Practice application shows that long anchor cable reinforcement technique can control effectively the collapse of mine roof in conjunction with the bolt and steel strip, which is a reference to similar mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.232