北河桥闸工程水工整体模型试验研究  被引量:2

Study on Hydraulic Model Test of Beihe Bridge-gate Project

在线阅读下载全文

作  者:赵燕华[1] 张金明 黄志文[3] 

机构地区:[1]陕西广播电视大学,陕西西安710119 [2]珠江水利科学研究院,广东广州510611 [3]江西省水利科学研究院,江西南昌330029

出  处:《水利与建筑工程学报》2013年第4期165-169,共5页Journal of Water Resources and Architectural Engineering

摘  要:为验证北河桥闸工程初步设计方案的合理性,依托1∶100的水工整体模型,对现状河床工程的行洪能力、通航条件、消能防冲及闸门调度等内容进行试验研究。试验结果表明,闸门敞泄时河道水流基本顺直,满足安全运行的要求,但上下游引航道口门区水流条件及下游口门区的横向流速均不满足通航要求,需对其进行优化。试验成果可供设计参考。In order to verify the rationality of Beihe bridge-gate project’s preliminary design,a hydraulic model test is conducted based on the hydraulic model with 1∶100.The test items include the discharge capability,navigation condition,energy dissipation and erosion control,gate operation,etc.The experiments show that the stream flow is straight and can meet the requirements of safety operation in the condition of the gate opening completely,but the flow condition of the up-downstream approach entrance area and the transverse flow velocity around the downstream entrance area cannot meet the navigation requirements,so,both of the above-mentioned conditions should be optimized.The results of the test can be used for the design of similar projects.

关 键 词:桥闸工程 水工整体模型 试验研究 水流条件 

分 类 号:TV131.61[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象