检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宿钟鸣[1]
机构地区:[1]山西省交通科学研究院黄土地区公路建设与养护技术交通行业重点实验室,山西太原030006
出 处:《郑州大学学报(工学版)》2013年第4期32-35,共4页Journal of Zhengzhou University(Engineering Science)
基 金:山西省交通建设科技项目(11-2-18)
摘 要:简要推导了Mindlin位移的黄土隧道系统锚杆轴力分布的理论解和弹塑性均质土体条件下围岩塑性区半径的理论解.以现场试验结果为依据,从拉拔力作用下系统锚杆的受力特性和锚喷支护中系统锚杆中性点的轴力两个角度出发,分析了黄土隧道中系统锚杆的受力特性及长度优化问题.The theoretical solution to the distribution of axial force in Mindlin displacement problem and the plastic radius of surrounding rock in the condition of elastoplastic homogeneous soil are deduced. Based on the results of field test, the mechanical characteristic of systematic bolt and its length optimization are discussed in loess tunnel from the two perspectives of the drawing force and axial force at the location of neural point. The results obtained will offer the technical support for the length optimization of systematic bolt in loess tunnel.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222