检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:戴吾蛟[1] 刘斌[1] 丁晓利[2] 黄大伟[1]
机构地区:[1]中南大学地球科学与信息物理学院,长沙410083 [2]香港理工大学土地测量与地理咨讯系,香港九龙红磡999077
出 处:《Transactions of Nonferrous Metals Society of China》2013年第7期2194-2200,共7页中国有色金属学报(英文版)
基 金:Project(41074004)supported by the National Natural Science Foundation of China;Project(2013CB733303)supported by the National Basic Research Program of China
摘 要:In the application of regression analysis method to model dam deformation, the ill-condition problem occurred in coefficient matrix always prevents an accurate modeling mainly due to the multicollinearity of the variables. Independent component regression (ICR) was proposed to model the dam deformation and identify the physical origins of the deformation. Simulation experiment shows that ICR can successfully resolve the problem of ill-condition and produce a reliable deformation model. After that, the method is applied to model the deformation of the Wuqiangxi Dam in Hunan province, China. The result shows that ICR can not only accurately model the deformation of the dam, but also help to identify the physical factors that affect the deformation through the extracted independent components.在利用回归分析对大坝形变进行建模时,回归方程常因为自变量间的多重共线性而产生病态问题,从而不能建立准确的模型。提出利用独立分量回归(ICR)建立大坝形变模型,并确定大坝形变的物理响应。模拟实验表明:ICR可以有效地解决病态问题,建立一个可靠的回归模型。将ICR用于中国湖南省的五强溪大坝建模,结果表明:ICR不仅可以建立准确的坝体形变模型,而且通过其提取的独立分量可以确定大坝变形影响因素。
关 键 词:dam deformation analysis independent component regression principal component regression ill-condition problem interpreting of dam deformation
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.97