基于BOM的项目看板进度预警模型研究  被引量:1

BOM-based Project Schedule Early-warning Model with Kanban Management

在线阅读下载全文

作  者:杜百岗[1] 郭顺生[1] 孙利波[1] 

机构地区:[1]武汉理工大学机电工程学院,湖北武汉430070

出  处:《武汉理工大学学报(信息与管理工程版)》2013年第4期570-574,共5页Journal of Wuhan University of Technology:Information & Management Engineering

基  金:国家自然科学基金资助项目(71171154);中央高校基本科研业务费专项资金资助项目(2012-ZY-033)

摘  要:针对水泥装备制造企业项目进度难以控制的问题,结合企业实际和BOM(bill of material)的层次,建立了多级看板管理进度预警模型。通过典型工序的看板控制及对工序、部件、产品和项目进度预警策略,实现了进度的分级监控和预警。实际应用表明,该模型能满足对项目进度预警的要求。A multi -stage kanban management model of project schedule early- warning was developed for the project schedule control difficulty in cement equipment manufacturing enterprise. The classification monitoring and early - warning were realized by kanban control for typical process as well as early - warning strategy for processes, parts, products and project pro- gress ,which are based on the level of BOM. The practical application in enterprise was accomplished successfully in demonstrating the effectiveness of the model.

关 键 词:BOM 典型工序 看板控制 延期率 进度预警 

分 类 号:F406.2[经济管理—产业经济]

 