检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋祖厂[1] 刘扬[1] 盖旭波[1] 赖学明[1] 李巧伟 窦守进[1] 邬楝[3] 张乐[1]
机构地区:[1]大港油田公司采油工艺研究院,天津300280 [2]天津万众科技发展有限公司,天津300280 [3]大港油田公司采油二厂,河北黄骅061103
出 处:《石油矿场机械》2013年第7期62-65,共4页Oil Field Equipment
基 金:中国石油大港油田公司关键技术攻关项目(20120204)
摘 要:针对桥式偏心、同心双管等分注新技术在大港油田高温、高压深斜井试验中存在的投捞测配遇阻遇卡、调配精度低、费用高、可靠性差等技术难题,开展了桥式同心分注技术研究与应用。现场应用29口井,施工成功率达到90%以上,分层水量测试调配精度达到96%,表明桥式同心分注技术在解决高温、高压深斜井井下分注技术难题方面具有显著的技术优势。The application of bridge type eccentric separate injection technology and concentric du- al-barrel separated injection technology were developed in the deep inclined wells of high tempera- ture and pressure in Dagang Oilfield where many problems exist, such as the huge difficulties of pulling and running for water injection allocation,the low accuracy in the allocating,the high cost and poor reliability. In order to solve these problems, the bridge concentric separated injection technology is developed and applied, which implements 29 wells in deep inclined wells,and the success rate of treatment has reached to 90% with 96% allocating accuracy. The results of test show that the technical problems of underground separated injection will be a great advantage in deep inclined wells of high temperature and pressure.
分 类 号:TE934[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33