检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛宏程[1] 李俊[1] 吕全伟[2] 王元欢[3]
机构地区:[1]四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065 [2]四川大学水利水电学院,四川成都610065 [3]中国科学院水利部成都山地灾害与环境研究所,四川成都610041
出 处:《中国农村水利水电》2013年第8期73-76,共4页China Rural Water and Hydropower
摘 要:干旱河谷环境下单沟泥石流向高含沙水流演化是泥石流防治工程的关键问题。以海子沟泥石流物源、地形和降雨量分析为基础,通过坑探方法、容重方法以及一次泥石流固体物质总量方法,分析了海子沟泥石流向高含沙水流演化的特征。结果表明:堰塞湖的存在对泥石流起到了缓冲作用,使泥石流容易转化为高含沙水流,降低了海子沟沟口工程在施工期内可能受到的危害。The transition of debris flow to hyper-concentrated flow is a key problem involved in debris flow engineering control.Based on an analysis of material source,topography and rainfall for debris flow in Haizi Gully,this paper studies the features of hyper-concentrated flow and debris flow through the methods of pitting,density and solid volume in one surge.The results indicate that the topography of deposit formed by dammed lake has a buffer action on debris flow,which has reduced the risk of the gully engineering in the period of construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249