检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京市建筑设计研究院有限公司,北京100045
出 处:《建筑结构》2013年第17期71-74,共4页Building Structure
摘 要:由于整体结构的复杂性,深圳湾体育中心钢结构的节点类型多达十几种,如网壳节点、网壳落地节点、树形柱柱脚节点、树形柱分叉节点、树形柱分枝与网壳连接节点等,其中树形柱分叉处的弯管节点更是工程的独创。对于一些关键节点,由于汇交杆件较多,构件之间的空间关系复杂,节点受力较大,导致节点设计难度很大。介绍了结构中的主要节点类型,讨论了节点设计的强度和刚度准则;采用壳体和实体单元,对结构中的关键和复杂节点进行了三维有限元分析,基于参数化模型,对节点的构造设计和传力模式进行了研究和优化。As the complexity of overall structure, there are many different steel structure joints in Shenzhen Bay Sports Center, such as latticed shell node, shell landing node, dendriform column foot node and fureation node, joint between tree-column branch and latticed shell, etc. The dendriform column furcation node with curved tubes was an original innovation of this project. For some key nodes, the detail design was difficult due to intersection of several members, complex spatial relationships between them and large nodal forces. Several main joint types are presented, and design criteria about strength and stiffness in joint design is discussed. By using shell or solid elements, three-dimensional finite element analysis was carried out for some key and complex joints. Based on parametric models, detail design and force transmission mode of the joints were optimized.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

