检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江勘测规划设计研究院,湖北武汉430010
出 处:《云南水力发电》2013年第4期16-19,共4页Yunnan Water Power
基 金:中国博士后科学基金资助项目;2012M521414
摘 要:在高拱坝工程中,泄洪功率及泄流量巨大,泄洪消能安全一直是工程研究的重点。基于淹没冲击射流理论探讨了水垫塘的消能机理,并结合工程实际总结了高拱坝工程中常用的水垫塘型式,以及各自的优缺点。提出并重点介绍了天然水垫塘这一新型消能型式及其在工程中的应用前景。In construction of a high arch dam sate tlood discharging and energy dlsszpatlon have always been taken as a priority in the study of the project due to its huge flood discharging power and flood discharge. The paper makes a discussion on the energy dissipation mechanism based on the submerged jet theory and summarizes various common types of plunge pools used in the construction of high arch dams and their respective advantages and disadvantages according to the construction practice. The paper has proposed and described the natural plunge pool, a new type of energy dissipation and the prospects for its application to the hvdror)ower construction projects.
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31