摘  要:空场法开采的矿山,往往留下大面积的采空区,易发生渐进式倒塌的整体性破坏。针对大量不规则点柱支撑顶板的复杂采空区结构,采用Voronoi图形划分方法确定顶板荷载面积,在此基础上提出了模拟矿柱破坏、荷载转移、应力重新分布过程的计算方法及其适用性。以浙江长兴白象硅灰石矿采空区结构为案例,进行了计算验证,圈定了潜在的采空塌陷区范围,并从理论上提出了控制采空区大面积塌陷的对策。该方法对于该类型矿山的采空区地压控制具有指导意义。Large-scale goaf may be formed by open stope mining process and the whole mine would be destroyed when cascading pillar failure happen. An attempt to simulate the cascading pillar collapse was made for a quick e- valuation of a large number of goaf data that had been collected throughout China. Pillar collapse, load transfer and re-distribution were modeled by territory area method and this methodology was general in sense. The method was applied to calculate the stability of Baixiang grammite mine goaf in Zhejiang province. The proposed method can provide a quantitative criterion for the determination of the failure pattern and identification of the key pillars in the stability analysis of the goaf formed by a pillar-room method.

关 键 词:采空区 渐进式破坏 VORONOI图 专家系统 

分 类 号:X936[环境科学与工程—安全科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象