三峡工程和向家坝水电站升船机船厢室结构设计对比及质量控制难点分析  被引量:3

Comparison between ship-chamber structural designs of ship-lifts for Three Gorges Project and Xiangjiaba Hydropower Station and analysis on difficulties of their quality controls

在线阅读下载全文

作  者:张壮志[1] 林新志 

机构地区:[1]中国长江三峡集团公司,湖北宜昌443002 [2]长江勘测规划设计研究有限责任公司,湖北武汉430010

出  处:《水利水电技术》2013年第9期68-72,75,共6页Water Resources and Hydropower Engineering

摘  要:三峡工程和向家坝水电站升船机船厢室塔柱结构高度分别达到146 m和153 m,属于高耸结构,但又不同于一般的民用高层建筑,其设计标准与风荷载、温度荷载取值、抗震设计、船厢的埋件设计、测量及施工控制精度等都是无规范可循。因此,两个升船机在设计、施工过程克服了较多技术难题,也积累了丰富的建设经验。本文通过两个升船机的设计异同及质量控制措施分析,为将来同类型升船机建设提供有益的借鉴。The tower structures of ship-chambers for both the ship-lifts of Three Gorges Project and Xiangjiaba Hydropower Sta- tion reach to 146m and 153m respectively, which belong to high-rise structure, but are different from the conventional high-rise civil buildings. For their constructions, no any technical specifications or criteria are there to be followed by the design stand- ards, the wind and temperature load value selections, the design of the embedded parts for the ship-chamber, the control accura- cies for survey and construction, etc. Therefore, not only many technical problems are overcome during the design and construc- tion of the ship-lifts, but rich construction experiences are also accumulated therein. Through the analyses made on the similari- ties and differences of the designs for both the ship-lifts as well as the quality control measures, some beneficial references are provided herein for the construction of the similar ship-lift in the days to come.

关 键 词:三峡工程 向家坝水电站 齿轮齿条爬升式升船机 设计 质量控制 

分 类 号:TV541[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象