检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:雷进生[1] 陈建飞[1] 王乾峰[1] 刘琼[1] 曹雪廷[1]
机构地区:[1]三峡大学土木与建筑学院,湖北宜昌443002
出 处:《水利水电技术》2013年第9期141-144,共4页Water Resources and Hydropower Engineering
摘 要:通过对混凝土中锚杆进行拉拔试验,研究并分析锚杆锚固直径、锚固长度及混凝土龄期与锚固强度的关系。实验结果表明:锚固力随混凝土龄期的增长呈非线性增长趋势,但增长速度逐渐减慢,并趋于稳定;锚杆的锚固力随锚杆直径、锚固长度增加而增大。但在混凝土早龄期锚杆直径对锚固力影响并不明显,应重点考虑混凝土强度增长确定合理的锚固长度。试验结果和理论分析为改善衬砌结构的受力状态、优化拆模时间提供了参考依据。Through the pull-out test on the anchor-boh in concrete, the relationship among the diameter and length of anchor- bolt, the age of concrete and the anchoring strength is studied and analyzed. The test result shows that the anchoring force pres- ents a trend of non-linear increase along with the increase of the concrete age, and then the increase rate slows down gradually and trends to be stable, while the anchoring force of anchor-boh increases along with the increases of both the diameter of anchor- bolt and its anchoring length. However, there is no obvious effect from the diameter of anchor-boh during the early-age of con- crete upon the anchoring force, and then the increase of the concrete strength must be considered for determining the reasonable anchoring length. The test result and theoretical analysis provide a reference basis for improving the stress state of lining structure and optimizing the form removal time.
分 类 号:TV43[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229