检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海大学理学院,上海200444 [2]广东工业大学管理学院,广州510520
出 处:《应用数学与计算数学学报》2013年第3期295-305,共11页Communication on Applied Mathematics and Computation
基 金:国家自然科学基金资助项目(11372170;60874039);教育部人文社会科学青年基金资助项目(11YJCZH019);上海市重点学科建设资助项目(S30104)
摘 要:讨论目标函数为最小完工时间之和的两阶段混合流水作业问题,第一阶段为批处理机且工件在其上的加工时间相等,第二阶段为同型机且工件在其上的加工时间任意.指出该问题为强NP-hard后,给出一近似算法并证明其性能比小于等于2.This paper analyzes the total completing time minimization m a two- stage flexible flowshop scheduling problem. All jobs have the same processing time at stage one, which is composed of a batch machine, and have arbitrary processing time at stage two, which is composed of rn identical processors. It is pointed out that the problem is strongly NP-hard, and then a heuristic algorithm H is provided. It is proved hat the performance ratio of the algorithm is less than or equal to 2.
分 类 号:O223[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3