基于价值工程的矿井施工方案评价  被引量:1

Evaluation of Coal Mine Construction Projects Based on Value Engineering

在线阅读下载全文

作  者:李红立[1] 李培磊 

机构地区:[1]重庆工程职业技术学院,重庆400037 [2]中国建筑第七工程局安装工程有限责任公司,郑州450002

出  处:《煤炭技术》2013年第9期144-145,共2页Coal Technology

基  金:重庆市高等教育教改项目(112098)

摘  要:文章介绍价值工程相关原理,引入模糊综合评价法,建立施工方案评价模型。方案综合评价中的加权评分法充分考虑专家和功能权重进行计算,并根据各方面的满足程度进行评价,提高了价值工程在施工方案评价与优化中的实用性。最后通过某矿井煤仓实例对模型进行分析评价,阐明价值工程模型在施工方案比选中的应用。The paper introduction of value engineering related principles,and quotes the tuzzy comprehensive appraisal method,then establish a construction scheme evaluation model.The weighted pointrating method of Scheme in comprehensive evaluation fully consider the weight of experts and function,and calculated,then according to various aspects of satisfaction to evaluate and improve the practicality of value engineering in construction scheme evaluation and optimization. Finally,with a mine coal bunker practical example of model analysis,the paper expounds the application of the value engineering evaluation model in construction scheme of the selected applications.

关 键 词:价值工程 矿井施工方案 功能评价 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象