检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋瑞平[1] 陶如钧[2] 周文明[2] 喻盛华 赵立佳[2] 韩万玉[2]
机构地区:[1]浙江大学建筑工程学院,浙江杭州310058 [2]中国水电顾问集团华东勘测设计研究院,浙江杭州310014 [3]浙江富春紫光环保股份有限公司,浙江杭州310012
出 处:《中国给水排水》2013年第18期100-102,共3页China Water & Wastewater
摘 要:江苏某污水处理厂面临提标扩容的任务,设计改造后总处理规模为5×104m3/d,出水水质需达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准,通过比较,选用了运行更稳定、经济效益更优的方案,将现有CAST工艺改造成A2O工艺,同时增加深度处理。改造后污水处理厂运行良好,各项出水指标均稳定达标。In order to meet the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002),a wastewater treatment plant in Jiangsu Province needed upgrading and expanding capacity up to 5 × 104 m3/d.A scheme with more stable operation and better economic benefit was selected by comparison,that is,the existing CAST process was replaced by A2O process,and an advanced treatment was added.After reconstruction,the wastewater treatment plant operated well,and the effluent quality met the discharge standard.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28