检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国航空规划建设发展有限公司,北京100120
出 处:《工业建筑》2013年第9期140-143,共4页Industrial Construction
摘 要:天津空客A320工程后装机库屋盖结构采用巨型钢管主桁架+平面次桁架形式,其中,钢管主桁架为国内首次采用高强度螺栓板节点。结合工程背景,分析该结构形式的受力特点,介绍高强度螺栓板节点的设计分析结果。设计施工表明,该工程主次桁架受力简单明确,高强度螺栓板节点施工简单,缩短施工周期。The roof structure of huge main pipe truss + second plane truss was used in final phase/flight line hangar in Tianjin Airbus A320 project. A high-strength bolt-plate connection in the main pipe truss was firstly used at home. In this paper, the mechanical features of the structure were analyzed; the design of high-strength bolt-plate connections in pipe truss was introduced in detail. The design and construction of this hangar demonstrates that the mechanical features were simple and definite for the main-second truss system, the construction of the high-strength bolt plate connections in pipe truss is simple, which can shorten the construction time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.151.249