检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550081 [2]中国水电工程顾问集团公司.北京100120
出 处:《水力发电》2013年第10期61-64,共4页Water Power
摘 要:如美水电站地处西藏高海拔地区,机组单机容量大,机组参数选择及机组结构设计时应考虑适应高海拔地区的特殊环境。以如美水电站为例,提出一些高海拔地区机组选择时应注意的问题及相应的解决方案,通过适当降低水轮机比转速及比速系数水平,优化机组结构形式,确保机组投产后安全、可靠、稳定运行。Because the Rumei Hydropower Station is constructed in high-altitude area of Tibet and has a larger unit capacity, the parameter selection and structure design of units should consider the adaptation of unit to high-altitude environment. Taking Rumei Hydropower Station as a case study, some questions on the selection of unit in high-altitude area are presented and corresponding solutions are also proposed. Through reducing turbine's specific speed and specific speed coefficient appropriately and optimizing unit structure, the safe, reliable and stable operation of units can be ensured.
分 类 号:TM312[电气工程—电机] TM275[一般工业技术—材料科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15