检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工程建设与设计》2013年第10期124-126,共3页Construction & Design for Engineering
摘 要:高速公路大修过程中,一般均采用加铺路面结构层的方案,路基一般加铺几层,有的加铺厚度甚至达到了30cm多,而桥面一般只能加铺一层上面层,致使路基路面与桥梁桥面存在一定的高程差,所以桥梁一般进行桥梁整体顶升,以接顺路面。论文介绍了桥梁整体顶升主要控制方法和控制的关键措施等。In the thorough repairation o/highway, the overlay of pavement structure will be used usually. The roadbed generallywiU be added a few layers, the thickness of which sometimes reaches to thirty centimetres. Bridge tend only to overlay a layer above, resulting in a difference of elevatio between the pavement and bridge deck. So the bridge should be overalllifted in order to pick up along the road. The article will discuss the main control method in the overall lifting construction o fbr/dge and its key measures.
分 类 号:U445.6[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198