检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁亚飞[1]
出 处:《硫磷设计与粉体工程》2000年第6期29-31,共3页Sulphur Phosphorus & Bulk Materials Handling Related Engineering
摘 要:硫酸装置化工投料试车前为给催化剂升温要设置预热炉、预热器或电炉,其投资大、利用率低。介绍300kt/a硫磺制酸装置不设预热炉、预热器的催化剂升温流程,升温前必须具备的条件,升温方法和注意事项。指出该技术是先进适用的,值得推广。In order to heat catalysts before commissioning,a pre-heater or an electrical furnace is usually needed in the sul-furic acid plant,but its investment is large while its utilization ratio is low. The author of the article describes the catalyst heating process in the absence of a preheater in the 300 kt/a sulfur-based sulfuric acid plant, necessary conditions before heating catalysts, and the heating methods and attention-worthy issues, and states that the process is advanced, practicable and worth wide application.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

