检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学建设工程学部,辽宁大连116024
出 处:《岩土工程学报》2013年第9期1659-1665,共7页Chinese Journal of Geotechnical Engineering
基 金:国家自然科学基金项目(50979014;51179024)
摘 要:紫坪铺大坝是世界上第一个遭受强震的百米以上面板堆石坝,在"5.12"汶川地震中有明显的局部损伤。采用有限元数据平滑方法,对大坝位移监测数据进行处理,得到了坝体典型剖面的永久应变。分析了大坝在地震中沉降和堆石料剪胀变形发生的部位和原因,表明坝体最大震陷率发生在2/3坝高附近;大坝发生剪胀的范围为坝顶区域和从坝顶往下25~30 m的上下游坝坡附近;永久剪应变过大是造成面板水平施工缝错台的直接原因。Zipingpu Concrete-Faced Rockfill Dam,which was subjected to significant local damage during "5.12" Wenchuan Earthquake,which is the first concrete-faced rockfill dam of more than one hundred meters in height encountering strong earthquake in the world.Based on the finite element data smoothing method,the permanent strain at a typical cross-section of the dam is obtained by processing the monitored displacement data.The positions of the dam settlement and rockfill dilatancy and the causes are analyzed according to the section permanent strain.The results show that the maximum settlement ratio of the dam approximately occurs at 2/3 of the dam height.The dilatancy occurs from the dam crest to 25~30 m in the upstream and downstream slope.The excessive permanent shear strain during the earthquake is the immediate cause for dislocation of the horizontal construction joints in the face slabs.
关 键 词:紫坪铺面板堆石坝 汶川地震 有限元数据平滑 永久应变 破坏机理
分 类 号:TV641.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222