寺河矿大采高综采面末采阶段水泥注浆控制片帮冒顶技术  被引量:5

The cement grouting reinforcement technique onworking face with large mining height in the end of mining stage in sihe mine tocontrolslide and roof fall

在线阅读下载全文

作  者:孙志勇[1] 郭相平[1] 颜立新[1] 

机构地区:[1]天地科技股份有限公司开采设计事业部,北京100013

出  处:《中国矿业》2013年第9期111-114,共4页China Mining Magazine

摘  要:寺河煤矿采用6.2m大采高综采一次采全高的采煤工艺,工作面进入末采阶段(工作面沿推进方向不足150m)易发生大面积煤壁片帮和端面冒顶事故。为了解决上述技术难题,在详细分析工作面围岩结构的基础上,针对性地提出水泥浆液预注浆控制工作面围岩垮落技术,采取6m浅孔堵漏注浆和12m深孔高压注浆相结合的施工工艺,保证了工作面的顺利推进和安全生产。By using 6.2meter full-seam mining technology in SiHemine,working face with large height in the end of mining stage(less than 150meters)will prone to happen slide and roof falling.In order to solve the technical problem,the cement grouting reinforement prevention and control technology were adopted on the basis of detailed analysis of rock structure.Taking the construction technology of combination of 6mshallow-hole plugging grouting and 12mdeep-hole high pressure grouting,we achieved smooth progress and safety in production of working face.

关 键 词:大采高综采面 末采阶段 水泥注浆加固 片帮冒顶 

分 类 号:TD265.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象