检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《人民黄河》2013年第10期124-126,共3页Yellow River
摘 要:黄河中游多沙粗沙区是我国水土流失最严重和生态环境最脆弱的地区之一。通过分析黄河中游多沙粗沙区的环境条件,揭示了该地区水土流失状况、治理成效和存在的问题,论述了多沙粗沙区综合治理规划:近期(2020年以前)实施综合治理面积3.92万km2,建设淤地坝1.53万座,其中骨干坝0.42万座。分析了其减沙作用:采用多沙粗沙区1956—2000年实测多年平均输沙模数1.02万t/km2分析计算,到2020年拦沙工程年平均拦沙能力新增1.56亿t,在该地区建设大中型拦沙坝、开展综合治理措施是减少黄河泥沙的有效途径。Area with abundant and coarse sediment in the middle reaches of the Yellow River is one of the most vulnerable areas of China's most seri- ous soil erosion and ecological environment. In order to seek ways to reduce sediment of the Yellow River, this paper analyzed the environmental con- ditions of the area with abundant and coarse sediment in the middle reaches of the Yellow River; revealed the water loss and soil erosion and govern- ance effects and problems in the region ; discussed the comprehensive control planning of the area with abundant and coarse sediment. The recent im- plementation of the comprehensive control area was 39,200 km2 and 15,300 warping dams would be built, including 4,200 key dams. The thesis ana- lyzed the effect of sediment reduction: the average sediment modulus of the measured area with abundant and coarse sediment in the period of 1956 - 2000 was 10,200 t/km2 , by 2020, block sand block capacity would he increased by 156 million t. It put forward the construction of large and medi- um-sized check dams in the region and taking integrated control measures were an effective way to reduce the sediment of the Yellow River.
分 类 号:TV212.41[水利工程—水文学及水资源] TV882.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.251.83