检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学建设工程学部,辽宁大连116024
出 处:《水利与建筑工程学报》2013年第5期200-203,共4页Journal of Water Resources and Architectural Engineering
摘 要:某碾压混凝土重力坝地处寒冷地区,且其施工方式采取通仓浇筑,不分纵缝以及越冬长间歇式的施工方法,增加了该碾压混凝土坝温控和防裂难度。为了对该工程温控措施及效果作深入了解,选取挡水坝段为研究对象,采用3种方案进行三维有限元温控防裂仿真分析。通过3种方案结果的对比,总结出在坝体施工过程中采取保温及通冷却水管的温控措施对改善坝体温度分布、降低温度应力、防止坝体出现裂缝具有重要意义,结果对该工程及类似工程的结构设计和具体施工具有重要的指导意义。A roller compacted concrete gravity dam is located in cold region, in its construction, the long block pouring method is adopted without longitudinal joints and with intermittent construction in overwintering, which would increase the difficulty of temperature control and crack control. In order to have a deep understand of the temperature control measures and effect of the project, the water retaining dam section is selected as the study object in this article, and three schemes are adopted for 3-D finite element simulation analysis. Compared with the results of the three schemes, it can be concluded that the temperature control measures such as insulation and cooling water pipes have important significance to improve the dam temperature distribution, lower the temperature stress and prevent the dam cracks. Also, the results of this article have important guiding significance in the structural design and construction of the project and similar ones.
关 键 词:寒冷地区 碾压混凝土 三维有限元 温控防裂 冷却水管 仿真分析
分 类 号:TV642[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229