大断面双线地铁隧道内撑拆除和二衬施作时机优化分析  被引量:3

Optimization analysis of the internal-support removal for a double metro tunnel with large sections and the construction time of secondary lining

在线阅读下载全文

作  者:董亥兴 李凌宜[1] 孙景凤 阳军生[2] 石宇[2] 

机构地区:[1]北京市公路桥梁建设集团有限公司,北京100068 [2]中南大学土木工程学院,湖南长沙410075

出  处:《交通科学与工程》2013年第3期40-45,共6页Journal of Transport Science and Engineering

摘  要:以长沙市轨道交通2号线溁湾镇站停车区间暗挖段为依托,基于有限元软件,对双侧壁导坑法施工内撑拆除和二衬施作时机不同施工工况进行了施工过程仿真模拟.通过对比分析,指出了适合现场实际的内撑拆除方式,确定了优化的二衬施作时机.该分析结果可以指导现场施工,也可以在后续类似工程施工中采用.Based on the Changsha Metro Line 2 Yingwanzhen Parking zone excavation tunnel,the finite element software is used for optimization analysis of the double-side- wall heading construction method internal-support removal and the construction time of secondary lining. Based on the results of the finite element numerical analysis,the appro- priate way of internal-support removal is chosen and the construction time of secondary lining is determined. The results can be used for the guidance of the site operation and can be provided as the reference for similar engineering.

关 键 词:双侧壁导坑法 内撑拆除 二衬施作时机 优化分析 

分 类 号:U455.91[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象