检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张建平[1] 张翔[2] 程浩忠[2] 马洲俊[2]
机构地区:[1]华东电网有限公司,上海200120 [2]上海交通大学,上海200240
出 处:《华东电力》2013年第9期1804-1807,共4页East China Electric Power
基 金:国家自然科学基金项目(51077091)
摘 要:介绍了"能效电厂"的概念和能效电厂与风电场同时参与随机生产模拟的处理方法,提出改进等效电量频率法对含能效电厂和风电场的电力系统进行随机生产模拟,对常规机组启停的影响进行了评估,计算了与火电机组开机、暖机等因素相关的动态费用,通过EPRI 36机改进算例对含风电电力系统中引入能效电厂的影响进行了定量分析和计算。This paper introduces the concept of EPP and the method of stochastic production simulation of power sys- tem including both wind farms and EPPs by using the improved equivalent energy and frequency function method. The impacts of wind farms on the start-up and shut-down of conventional units are evaluated ; the dynamic costs related with the start-up and warm-up of thermal units are calculated. Finally the impacts of the introduction of EPP to power system with wind farms are analyzed and calculated quantitatively with the improved calculation example of EPRI 36 unit.
分 类 号:TM727[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145