检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学研究生院,江苏南京210098 [2]北京联合大学,北京100010
出 处:《人民长江》2013年第19期16-19,43,共5页Yangtze River
摘 要:为增强灌区闸门调节的预见性,避免因频繁调节影响闸门的使用寿命,引入信息融合理论,基于不确定系统输入的状态方程和量测方程,通过叠加"干扰用水"对系统输入进行估计,实现了对系统状态的跟踪和预测。在此基础上,以PID调节器为例,通过引入全局预测信息,增加闸门调节所依据的信息量和信息的互补性,并应用信息融合技术进行综合,改善了闸门调节器性能。所提出的闸门调节方法适用于渠系水流一类具有明显惯性和时滞现象的非线性系统。该方法对其他调节器同样适用。For improving regulating predictability of irrigation gate so as to avoid shortening its service life due to frequent operation, information fusion theory is applied into water information field. Based on the state equation of indeterminate system input and measurement equation, the presented method superimposes " noise of water consumption" to estimate the system input, realizing tracking and forecast of the system state. Based on this, by considering global forecasting information and applying technology of information fusion, the presented method increases amount of information and information complementarity of PID controller, based on which the irrigation gate can be adjusted. The proposed method improves performance of the gate controller, thus suiting for regulating of canal water that is a nonlinear system characterized by obvious inertia and delay phenomenon. It is noted that the proposed methodology can also be applied to other controller besides PID controller.
分 类 号:S27[农业科学—农业水土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.209.242