检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:章之燕[1,2]
机构地区:[1]开滦(集团)有限责任公司唐山矿业分公司,河北省唐山市063000 [2]中国煤炭学会岩石力学专业委员会,北京市朝阳区100013
出 处:《中国煤炭》2013年第10期53-55,共3页China Coal
摘 要:针对大倾角上山掘进在机械化综合配套快速掘进方面没有过多的实践,开滦唐山矿通过合理选择掘进配套设备,改进掘进机液压系统,优化掘进施工工艺和截割方式,建造人工平台等措施,实现了Y485里工作面平均26°、最大29°的大倾角上山机械化掘进,突破了掘进机在大倾角上山施工的限制,为大倾角上山机械化掘进探索了施工技术和工艺。For there is no much practice of steep uphill tunneling in rapid driving with mechanized comprehensive supporting, through reasonably selecting excavation equipment, improving the hydraulic system of roadheader, optimizing the tunneling construction process & cutting mode and building artificial platform and other measures, Tangshan Mining Branch Company of Kailuan Group has achieved the steep uphill mechanized tunneling with average of 26° and maximal angle of 29 ° in Y485 working face, which has broken the constraints of steep uphill construc- tion of the roadheader, and explored the construction technology and process for the steep uphill mechanized tunneling.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28