作 者:赵海军[1,2]
机构地区:[1]哈尔滨电机厂有限责任公司,哈尔滨150040 [2]东北林业大学机电工程学院,哈尔滨150040
出 处:《黑龙江电力》2013年第5期459-461,共3页Heilongjiang Electric Power
摘 要:详细介绍了溪洛渡左岸首台770 MW发电机定子绕组安装工艺。在借鉴三峡水轮发电机定子绕组安装经验基础上,重点阐述了溪洛渡左岸电站哈尔滨电机厂有限责任公司生产的定子绕组的结构设计及安装特点,同时,对安装遇到的难点进行了分析并给出了解决措施。经试验表明,安装后的机组各项技术指标均符合国家标准要求。这次成功的安装为百万千瓦机组定子绕组的安装积累了可行借鉴经验。This paper introduces the installation technique of stator winding of the first 770 MW generator in Xiluodu Left- Bank hydroelectric station, emphasizes on expounding the structure design and installation characteristics of stator winding on the basis of the installation experience from Three Gorges hydro - generator, and analyzes the difficulties encountering in installation and proposes solutions. Through the test, it is proved that the technical indicators of units after the installation meet the requirements of national standards. The successful installation accumulates feasible experience for stator winding installation of 1 000 MW units.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117