溪洛渡左岸电站定子绕组安装技术  被引量:1

Installation technology of stator winding for Xiluodu Left- Bank hydroelectric station

在线阅读下载全文

作  者:赵海军[1,2] 

机构地区:[1]哈尔滨电机厂有限责任公司,哈尔滨150040 [2]东北林业大学机电工程学院,哈尔滨150040

出  处:《黑龙江电力》2013年第5期459-461,共3页Heilongjiang Electric Power

摘  要:详细介绍了溪洛渡左岸首台770 MW发电机定子绕组安装工艺。在借鉴三峡水轮发电机定子绕组安装经验基础上,重点阐述了溪洛渡左岸电站哈尔滨电机厂有限责任公司生产的定子绕组的结构设计及安装特点,同时,对安装遇到的难点进行了分析并给出了解决措施。经试验表明,安装后的机组各项技术指标均符合国家标准要求。这次成功的安装为百万千瓦机组定子绕组的安装积累了可行借鉴经验。This paper introduces the installation technique of stator winding of the first 770 MW generator in Xiluodu Left- Bank hydroelectric station, emphasizes on expounding the structure design and installation characteristics of stator winding on the basis of the installation experience from Three Gorges hydro - generator, and analyzes the difficulties encountering in installation and proposes solutions. Through the test, it is proved that the technical indicators of units after the installation meet the requirements of national standards. The successful installation accumulates feasible experience for stator winding installation of 1 000 MW units.

关 键 词:溪洛渡水电站 水轮发电机 定子绕组 安装 结构设计 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象