检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]重庆交通大学土木建筑学院,重庆市400074 [2]同济大学地下建筑与工程系,上海市200092
出 处:《公路》2013年第10期227-231,共5页Highway
基 金:国家自然科学基金资助项目;项目编号40672184
摘 要:以旦架哨三车道浅埋软岩隧道为例,采用有限元法对全断面法、台阶法和CD法开挖的施工过程进行了三维数值模拟,分析了地表、横断面和纵断面上的位移响应规律。研究表明:三种方法施工围岩位移的响应规律基本是类似的,CD法施工产生的位移值相对较小;隧道地表变形近似为槽形,且主要由邻近段开挖引起;竖向变形主要分布在拱顶附近,且主要由当前段开挖引起;掌子面空间效应的影响范围约2倍洞径,该范围外围岩沉降变形基本趋于稳定。The Danjiashao Tunnel is a typical three-lane shallow structure in soft rock mass. Using fi- nite element method (FEM), the construction process of tunnel is simulated, which includes entire section method, benching method, and CD method. The displacement response of surface, cross section and pro- file are studied. The results show that. (1) the rules of displacement variation for different excavation method are similar, and the value by CD method is least~ (2) the surface settlement is approximately chan- nel shaped which is mainly formed by the excavation of neighboring segment (3) the vertical strain is mainly located near tunnel crown and caused by excavation of the current part; and (4) the constraint of tunnel face has impact on the surrounding rock mass within approximately 2 times of span, beyond which the displacement will become constant.
分 类 号:U451.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3