检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:熊英[1] 董文龙[2] 戴亚伟[3] 常晓平[1] 申进[1] 周永强[1]
机构地区:[1]中国石化河南油田分公司石油勘探开发研究院,河南南阳473132 [2]中国石化河南油田分公司第一采油厂 [3]中国石化河南油田人力资源开发中心
出 处:《石油地质与工程》2013年第4期131-133,76,共4页Petroleum Geology and Engineering
摘 要:在认识下二门油田二次聚合物驱见效特征及剩余油分布特点的基础上,通过注聚阶段提高注入浓度、追加段塞、部署完善井及合理动态调配等系列调整工作,实现了二次聚驱大幅提高采收率的目标。在下二门油田潜力区部署的3口油井投产初期日产油10.5~22t,含水20%~70%;单元二次注聚见效高峰期增油倍比达3.04,含水降低7.5%,阶段提高采收率4.96%。On the basis of effective characteristics of secondary polymer flooding and remaining oil distribution features , by enhancing injection concentration in polymer injection period , adding slugs , deploying improved wells and other reasonable dynamic adjustment , the secondary polymer flooding target , greatly enhanced recovery has been achieved.The initial daily oil production of 3 oil wells in potential area of Xia 'ermen oilfield is about 10.5~22 t , with water cut of 20%~ 70%.After secondary polymer flooding , the effective peak increased oil is about 3.04 times before , with decreased water cut of 7.5%and enhanced recovery of 4.96%.
分 类 号:TE357.431[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15