150t顶底复吹转炉全程底吹氮气的工艺探讨  被引量:2

PROCESS DISCUSSION ON WHOLE PROCESS BOTTOM N_2 BLOWING IN 150t TOP-BOTTOM COMBINED BLOWING CONVERTER

在线阅读下载全文

作  者:王小峰[1] 吕亚[1] 刘磊[1] 谢启涛[1] 

机构地区:[1]安阳钢铁集团有限责任公司第二炼轧厂,河南安阳455004

出  处:《冶金丛刊》2013年第5期14-16,36,共4页Metallurgical Collections

摘  要:对150 t顶底复吹转炉氮氩切换工艺和全程底吹N_2工艺进行试验,结果表明:采用全程底吹N_2工艺,当供氮强度不超过0.032 m^3/(min·t)时,出钢前冶炼终点钢液氮含量为0.001%左右,钢中氮含量不会明显增加,与氮氩切换工艺相当。因此绝大部分钢种可以采用全程底吹N_2的工艺进行冶炼,能够满足钢水质量要求。The change-over from N2 to Ar and whole process bottom blowing N2 are studied by experiments in 150t top-bottom combined blowing converter. The experimental results show that the end-point nitrogen content is about 0. 001% which is equivalent to the end-point nitrogen content by change-over from N2 to Ar technology under experimental condition when nitrogen supply intensity does not exceed 0. 032m3/(min . t). It is proposed that almost all steel grades can be melted by using whole process bottom blowing N2 technology and their nitrogen content can meet the needs of quality demands.

关 键 词:顶底复吹转炉 全程吹氮 工艺探讨 

分 类 号:TF729[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象