波纹管换热器管束整体失稳分析及设计计算要考虑的问题  被引量:5

Overall Stability Analysis of Tube Bundle and Some Problems during Design Calculation for Corrugated Tube Heat Exchanger

在线阅读下载全文

作  者:李永泰[1] 陈永东[1] 陈明健[1] 张中清[1] 李志[1] 

机构地区:[1]合肥通用机械研究院,安徽合肥230031

出  处:《压力容器》2013年第6期12-15,49,共5页Pressure Vessel Technology

摘  要:介绍了一台波纹管换热器在管程压力试验过程中管束整体失稳的情况,将波纹管等效为直光管,并对相关参数进行合理修正,按分析设计标准JB 4732附录Ⅰ固定式管板计算方法进行计算及失稳原因分析。并对GB 151新标准制定波纹管换热器管板设计计算方法提出修改建议。A failure case of the tube bundle overall stability was introduced for a corrugated tube heat exchanger during tube-side hydraulic test.While the corrugated tube was treated as the straight smooth tube,the related parameters were reasonably modified.The calculation method for fixed tube-sheet in the Appendix Ⅰ of JB 4732 was adopted and failure cause was analyzed.Finally,some suggestions were presented for the amendment to tube-sheet design calculation method of corrugated tube heat exchanger in the new version of GB 151.

关 键 词:固定式换热器 管板 波纹管 失稳 

分 类 号:TH123[机械工程—机械设计及理论] TQ051.5[化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象