摘 要:杨房沟水电站地下厂房是典型的大跨度、高边墙地下洞室群,工程区地质条件较复杂,高边墙及洞室间岩柱的稳定性是洞室设计的关键。根据地应力测试数据,采用边界位移条件回归方法,构造出厂区初始地应力场。采用FLAC3D软件对洞室群围岩稳定进行计算分析,获得洞周围岩变形与应力特征、塑性区分布及支护结构的受力状态,对地下厂房洞室群围岩稳定性做出评价,为洞室设计提供了科学依据与技术指导。The underground powerhouse of Yangfanggou hydropower station is a typical large-span and high side wall cavern group. The geological condition is complex. The stability analysis of high side wall and the rock pillar between caverns is key for cavern design. Based on in-situ test data,using boundary displacement condition regression method,the initial geostress field is constructed. The stability of surrounding rock of underground caverns is analyzed by FLAC3D. The deformation and stress characteristics,plastic zone distribution field and force of support are obtained. The integrated stability of underground powerhouse is evaluated. The study results provide scientific basis and technical advice for caverns design.
关 键 词:水利工程 杨房沟水电站 地下厂房 高边墙 初始地应力场 围岩稳定
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222