检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Tao Wang Xiaolei Yang Qijun Tang Jia Li Xuandong Liu
机构地区:[1]Wenzhou Electric Power Bureau, Wenzhou 325028, China [2]High Voltage Division, Xi "an Jiaotong University, Xi 'an 710049, China [3]Northwest Hydro Consulting Engineers CHECC, Xi 'an 710049, China
出 处:《Journal of Energy and Power Engineering》2013年第10期1992-1997,共6页能源与动力工程(美国大卫英文)
摘 要:Recently, the frequent extreme natural disasters made enormous damage to the electric grid leading to blackouts. The lifeline system aiming at providing continuous power supply for the important load in extreme natural disasters was designed in that condition. In this paper, a developed model for planning of the transformer substation in lifeline system which considered the effect of existing transformer substations, the motivated areas and punishment areas was proposed. The Hopfield NN (neural network) was adopted to solve the feeders and the PSO (particle swarm optimization) was adopted to new the locations of the transformer substations based on the feeders. The planning result not only took fully use of the existing substation but also got the suitable location for new construction which was satisfactory.
关 键 词:Lifeline system transformer substation Hopfield NN PSO.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33