检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘议华[1] 黄川[1] 周益[1] 严震平[1] 钱军[1]
机构地区:[1]上海市电力公司市南供电公司,上海200233
出 处:《华东电力》2013年第10期2043-2047,共5页East China Electric Power
摘 要:将基于启发式能量函数观点的无功裕度运用到电力系统无功规划优化中,根据系统中各节点的无功裕度排列顺序确定无功补偿节点,并运用改进的自适应遗传算法对电力系统无功进行规划优化。在所建立的无功优化数学模型中,综合考虑了通过安装无功补偿装置所降低的有功损耗和安装无功补偿装置投资两者的综合费用最小。通过IEEE 30节点算例表明,该方法使系统中的无功电源得到合理地配置,有效的降低了系统的有功损耗,提高了电力系统的电压稳定性。Reactive power margin based on heuristic energy function is applied in the reactive power planning of power system. The reactive power compensation nodes are determined based on the order of reactive power margin of each node in the system. Then the improved adaptive genetic algorithm is used for power system reactive power planning optimization. Reactive power optimization mathematical model is built with the comprehensive consideration of the minimal investment cost in installing reactive power compensation device to reduce the energy loss and in installing reactive power compensation device. The IEEE30 node calculation result shows that this method can effectively allocate reactive power in the system to reduce the active loss and improve the vohage stability of power system.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.252.20