检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第四航务工程局有限公司,广东广州510231 [2]中交四航局第二工程有限公司,广东广州510300
出 处:《建筑经济》2013年第11期54-56,共3页Construction Economy
摘 要:建筑材料价格上涨是施工合同履约过程中常见的情况,造成承包商费用的增加。如何妥善处理由此产生的索赔争议,对工程的顺利实施具有重要意义。以某工程为例,探讨因材料价格上涨导致的索赔及索赔处理的方法,提出"尊重合同约定,参照国家有关价格调整的政策,结合工程实际情况,合理分担风险"的处理原则,进而形成操作性强的调整方法,在实践中得以运用,并从减少索赔争议出发,提出建议。Building materials prices rising which caused the rise of contractor cost often occur in the performance of construction contract. How to properly handle the claims disputes, is of great significance to the project successfully achieved. Based on an example project in Fujian province, this paper discusses the claims which due to material price increases, and the claims solution. This paper puts forward a principles manage claims that is "respect the contract, refer to the price adjustment of national policy, reasonable risk-sharing consideration to practice of project", and form a feasible method, which applied in practice. Finally, based on reducing claims disputes, some suggestions are given.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74