温州市铁路新客站运营初期周边路网建设时序方案研究  

Study on Construction Timing Scheme of Surrounding Road Network in Initial Operation Period of New Wenzhou Railway Station

在线阅读下载全文

作  者:廖秀斋 林枫 金伊诺 

机构地区:[1]温州市城建设计院,浙江温州325000

出  处:《城市道桥与防洪》2013年第10期20-25,13-14,共6页Urban Roads Bridges & Flood Control

摘  要:面对铁路新客站建成投用后周边路网建设滞后的局面,通过对现状实际路网容量的调查与梳理,利用交通规划软件TransCAD进行交通需求定量分析,提出周边道路建设时序方案,以确保运营初期交通运行安全、集散有序。经三年时间的实践检验,该研究成果切实可行。In the face of the construction lag of the surrounding road network after the new railway station put into operation, and according to the investigation and summary of the practical capacity of the present road network, the transport planning software TransCAD is used to quantitatively analyze the transport demand. The construction timing scheme of the surrounding roads is put forward to ensure the operation safety and distribution in order of the transport in the initial operation period. This study result is feasible after three years of practice tests.

关 键 词:铁路新客站 交通保障 建设时序 TRANSCAD 

分 类 号:U491.13[交通运输工程—交通运输规划与管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象