检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南通市广播电视大学建筑工程系,江苏南通226026 [2]江苏省城市职业技术学院南通校区,江苏南通226026
出 处:《施工技术》2013年第20期96-98,共3页Construction Technology
基 金:国家自然科学基金项目(50477010)子课题
摘 要:以新型卸荷式板桩码头施工为例,结合实际工况首次提出适合于新型卸荷式板桩码头的关键施工技术与工艺,并针对该施工技术特点详细阐述其施工流程,包括导墙设置、钢筋笼吊装、地下连续墙及裙桩施工等关键质量控制点的主要施工技术及注意事项,进而解决了新型卸荷式板桩码头施工风险大、工程质量难以控制以及工程进度缓慢等问题。研究结果证明:适用于新型卸荷式板桩码头的关键施工技术可靠稳定、综合效益明显。The construction of the new unloading type sheet pile wharf was set as an example, and combined with the actual working condition, the construction and the key technology suitable for new unloading type sheet pile wharf was put forward firstly. And the construction processing according to the eharacteristics were described, including the guide wall setting, steel reinforcement cage hoisting, diaphragm wall and skirt pile construction. These construction technologies solved the problems of risk, difficult control of engineering quality and engineering practice shows that the construction slow process of the unloading type sheet pile wharf technologies are reliable and stable. high The
关 键 词:卸荷式板桩码头 导墙 钢筋笼 地下连续墙 施工技术
分 类 号:TU753.6[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112