机构地区:[1]中国水电工程顾问集团有限公司,北京100120 [2]云南省水利水电勘测设计研究院,云南昆明650021
出 处:《水力发电》2013年第11期4-5,33,共3页Water Power
摘 要:牛栏江-滇池补水工程征地移民工作在征地补偿标准、已建电站补偿和移民安置方式等方面遇到了巨大困难。按照同库同价、线路取各乡镇对应补偿标准确定征地补偿标准,按固定资产残值、预期发电收益评估值确定已建电站补偿标准,因地制宜、尊重移民意愿确定移民安置方式,移民安置方案得到了群众及地方政府的肯定。Abstract: The construction of Niulan River-Dianchi Lake Water Supplement Project encounters great difficulties in the compensation of land acquisition and in-operation hydropower stations and the way of resettlement. The compensation standard of land acquisition is determined according to the principle of same level in one reservoir area and taking local land acquisition compensation standard as the level of water delivering project. The assessed value of residual value of fixed assets and the expected power generation income are used to determine the compensation standard of in-operation hydropower stations. The ways of resettlement are determined according to local conditions and immigrant wishes. The final resettlement plan is affirmed by immigrants and local governments.
关 键 词:关键词 建设征地 征地补偿 移民安置 安置规划 牛栏江-滇池补水工程
分 类 号:TV672[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31