检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖华波[1] 易志坚[2] 刘懿辉[1] 夏万洪[1]
机构地区:[1]中国水电顾问集团成都勘测设计研究院有限公司,四川成都610072 [2]中国水电工程顾问集团有限公司,北京100120
出 处:《水力发电》2013年第11期16-19,共4页Water Power
摘 要:雨日堆积体位于雅砻江中游楞古水电站上、下比选坝段之间,总体积约2 100万m3,其下部基岩边坡浅表部发育松动变形岩体,体积约420万m3,直接关系到坝段的选择。根据现场地表地质调查及勘探揭示成果,建立了详细的地质模型,采用极限平衡法、拉格朗日差分法计算其稳定性。结果表明,雨日堆积体及下部松动变形岩体在各种工况下整体稳定性均较好,在地震、下坝段蓄水工况下有发生局部变形失稳的可能,对上、下坝段方案影响均较小。Abstract: Yuri Accumulation Body is located between two proposed dam sites of Lenggu Hydropower Station in the middle reaches of Yalong River. The total volume of Yuri Accumulation Body is about 21 million m3, and the shallow surface of its lower slope develops a slackened rock mass with a volume about 4.2 million m3. The stability of this accumulation body has a direct impact on dam site selection. According to the results of geological survey and exploration, the geological model of this accumulation body is established to analyze its stability by Limit Equilibrium Method and Lagrangian Difference Method. The results show that the accumulation body and its lower slackened rock mass are good in overall stability under all conditions, but may be unstable in local when earth-quaking or reservoir filling. This accumulation body has little effect on two dam site program.
关 键 词:关键词 工程地质问题 堆积体 松动变形岩体 稳定性 楞古水电站
分 类 号:TV697.23[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117