检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘许超[1] 董莉莉[1] 卢玲[1] 周雪梅[1]
机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003
出 处:《华北水利水电学院学报》2013年第5期27-30,共4页North China Institute of Water Conservancy and Hydroelectric Power
摘 要:Coca Codo Sinclair水电站的沉沙池结构复杂、特殊,工作流量比较大.基于此,应用大型通用结构分析软件ANSYS对无拉杆和有拉杆两种池箱结构方案进行三维有限元分析,对不同结构的应力和配筋量进行比较.结果表明:设置拉杆可有效地减小沉沙池边墙及斜坡板的悬臂效应,改善结构的整体受力状态;通过对有拉杆方案的计算分析得知,在池箱两边墙的外侧、排沙孔周、中墙底部及拉杆部位均出现较大的拉应力,这些部位是沉沙池结构的薄弱部位,应在设计中充分考虑并进行处理.Desilting basin of Coca Codo Sinclair hydropower station has a characteristic of complex and special structure, relatively large work flow. In this paper, the structure of grit chamber with and without draw bar of structure is analyzed by 3D finite element ac- cording to relevant standards. By comparison of different stresses and reinforcement quantity, it is found the draw bar can decrease the cantilever effect of sidewall and slope board, improve the whole stress state. By the calculation and analysis of with-draw-bar scheme, the fairly big tensile stress is located at the outside of sidewall, around the sediment flushing outlet, at the bottom of mid-wall and draw bar, which are all the vulnerable parts of the grit chamber and should be fully considered and processed in design. This can provide a reference for structural design of desilting basin.
分 类 号:TV314[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.192.125