三峡右岸电站励磁系统调试  被引量:2

Excitation system debugging in Three Gorges right bank Hydropower Station

在线阅读下载全文

作  者:巨民尚[1] 

机构地区:[1]西安热工研究院,陕西西安710032

出  处:《水电站机电技术》2013年第5期18-20,32,共4页Mechanical & Electrical Technique of Hydropower Station

摘  要:三峡右岸电站机组的安装和调试于2006年开始,右岸电站机组励磁系统采用南瑞集团与德国SIEMENS合作提供的THYRIPOL励磁系统设备,调试过程中顺利完成了甩负荷、电气制动等试验。从调试完成后的机组运行情况来看,本系统硬件配置合理,软件流程编制符合机组实际运行要求,机组整体运行稳定。用于完成本系统调试的整套调试流程充分发挥了其技术指导性作用,值的同行借鉴和参考。Installation and debugging of hydro-generator units in Three Gorges right bank Hydropower Station was started from 2006.The excitation system of generator is THYRIPOL excitation system which was Nanri Group and SIEMENS collaborate produced.Test of load shedding,electric braking and so on were finished successfully.Units' running condition was stable,system hardware configuration is suitable and software procedure is fit for units' operation requirements.The debugging procedure of this test made guiding technique role,it can be referred by other power stations.

关 键 词:三峡右岸电站 励磁系统 调试 

分 类 号:TV734[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象