超大深基坑BIM施工全过程模拟与分析研究  被引量:37

The whole process BIM simulation and analysis research of extra large deep foundation pit construction

在线阅读下载全文

作  者:吴清平[1] 时伟[1] 戚铧钟[1] 邹玉娜[1] 

机构地区:[1]青岛理工大学土木工程学院,山东青岛266033

出  处:《工程建设》2013年第5期20-24,共5页Engineering Construction

摘  要:采用BIM技术对上海SOHO天山广场超大深基坑工程进行设计施工全过程模拟与分析。通过运用BIM技术中的Revit建立深基坑支护结构三维模型,生成漫游动画,对具体施工部位与管理作出预测与指导,结合Navisworks做出施工过程模拟动画,全方位清晰体现地下工程的虚拟施工过程,从而发现模拟施工中可能出现的各种问题并做出相应的预防控制措施。The simulation and analysis of the process for super large deep foundation pit project of S whole design and construction hanghai SOHO Tianshan square were carried out by adopting BIM technology. Revit in BIM technology was used to establish the 3 d model, generate roaming animation, predict and instruct the specific construction site and management, in combination with Navisworks, the simulation ani- mation of the construction process was made, the virtual construction process of under- ground engineering was reflected clearly, thus various kinds of problems which might occur in simulation construction would be found out, and corresponding control meas- ures would be taken.

关 键 词:深基坑工程 BIM建筑信息模型 REVIT 全过程模拟 

分 类 号:TU753.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象