检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张伟[1] 崔文娟 蔡新合[3] 郭永康 顾斌[1]
机构地区:[1]黄河上游水电开发有限责任公司,西宁810008 [2]河南黄河勘测设计研究院,郑州450002 [3]中国水电顾问集团西北勘测设计研究院,西安710065 [4]青海黄河水电公司公伯峡发电分公司,青海省化隆县810902
出 处:《西北水电》2013年第5期13-15,20,共4页Northwest Hydropower
摘 要:积石峡水电站面板堆石坝坝址为左右岸不对称的复式河谷地带,为预防面板堆石坝发生不均匀沉降,施工中采用坝基处理、分期分区填筑、坝料洒水碾压、坝体浸水等措施。经后期监测,仅发生了约2 mm的不均匀沉降,取得了良好的控制效果。The CFRD dam site of Jishixia Hydropower Project is seated in the compound valley with asymmetric banks. To prevent the CFRD from occurrence of uneven resettlement, proper measures are taken in construction such as foundation treatment, embankment at stage and zone, roller compaction of the embankment materials with water sprayed, dam body inundated in water, etc. After the late measurement, 2mm uneven settlement occurs only and an expected uneven settlement control is achieved.
关 键 词:面板堆石坝 不对称河谷 不均匀沉降 控制 积石峡水电站
分 类 号:TV641.4[水利工程—水利水电工程] TV698.11
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79