M310堆型核电站役前检查与系统水压试验实施时机探讨  被引量:5

Discussion on Operation Occasion of Pre-Service Inspection and Main Primary System Hydrostatic Test of PWR

在线阅读下载全文

作  者:孙海涛[1] 张跃[1] 王臣[1] 盛朝阳[1] 贾盼盼[1] 

机构地区:[1]环境保护部核与辐射安全中心,北京100082

出  处:《核动力工程》2013年第5期135-138,共4页Nuclear Power Engineering

摘  要:通过对核安全导则HAD103/07、RSE-M规范、ASME规范第XI卷和法国1999法令等相关文件的解读,结合目前国内压水堆核电站役前检查的工程实践,分析役前检查与水压试验的相互影响,形成对机组一回路役前检查与系统水压试验实施时机的技术方案。By comprehensive analysis of Guide 103/07 of Nuclear Safety of the People's Republic of China (HAD 103/07),In-Service Inspection Rules for the Mechanical Components of PWR Nuclear Islands (RSE-M),Section Ⅺ of American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME) and French 1999 decree about in-service supervision items for main primary and second loops of PWR Nuclear Plant,and etc,as well as combined with the present domestic engineering practice in pre-service inspection,besides the analysis of the affects respectively caused by that pre-service inspection executes before hydrostatic test and hydrostatic test executes before pre-service inspection,technique views were formed for operation occasion between pre-service inspection and hydrostatic test for main primary system.

关 键 词:压水堆核电站 役前检查 系统水压试验 实施时机 

分 类 号:TL364.1[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象