检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡亮[1] 樊祥船[1] 王娜[1] 石亮亮[1] 范世运[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2013年第11期1-2,11,共3页Water Resources & Hydropower of Northeast China
摘 要:通过对辽宁电网电源优化配置分析,得出辽宁电网建设抽水蓄能电站的需求空间较大,且省内可供开发的抽水蓄能电站站点较多。今后电网在建设高温高压大容量燃煤火电机组、积极发展新能源的同时,还应加强对省内抽水蓄能电站等调峰电源的开发建设,形成以供热机组和大容量燃煤火电机组承担系统基荷和腰荷,以抽水蓄能电站和水电为主的调峰电源,承担系统峰荷的较为合理的电源结构。Based on the analysis of power source optimization allocation of Liaoning power network, the demand space of building is the larger and the developed sites are more for the pumped storage power station in Liaoning province. In the future peaking power sources including pumped storage power station should be developed and constructed when the building of the high temperature and high pressure and large capacity coal fired units and developing new energy sources for the power network, which could form the proper power source structure based on the heat supply unit and large capacity coal fired units as the system low load and medium load and the pumped storage power station and hydropower as peak load
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74