检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王鹤[1] 史光宇[1] 吉士道[1] 刘群辉 黄远泽[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]中水东北勘测设计研究有限公司监理公司,吉林长春130021
出 处:《东北水利水电》2013年第11期9-11,71,共3页Water Resources & Hydropower of Northeast China
摘 要:根据双沟水电站工程坝址处的地形地质条件、工程布置特点、坝型及第二松花江水文特性,进行导截流设计。说明了在高寒山区有上游水库帮忙条件下,面板堆石坝施工截流设计实施过程中,为减小截流施工的难度,除按理论计算结果进行充分准备外,还应改善截流条件,提高抛投强度,并充分考虑一切不利因素,以保证截流顺利成功。Based on the topography and geology condition site, project layout characteristic and dam type of Shuanggou hydropower station dam, the hydrologic characteristic of the second Songhuajiang river, the river diversion and closure design is completed. In alpine region, with the reservoir in the upper reaches, many factors should be considered to reduce the difficulty of closure construction and ensure the closure success in the construction of the face rockfill dam, that include the full preparation of theoretical calculation results, improving closure condition, enhancing dumping intensity and considering all unfavorable factors.
分 类 号:TV551.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.239.16